Jibetech

Jul 12, 2013 by

Fått lite information från Andrew Pimental  om vad som är de stora förändringarna i den nya versionen av Jibetech Snipe som byggs i USA

Hey Tobias

I cut the mold apart at the chines and moved them down and out. Now the chines are max deep and wide. Molds shrink and then the boats shrink so the boat comes out much smaller than the original plug. On the deck we made the large recess for the jib turning block and cleat so the jib can go forward and back and in and out. No more bracket hitting the crews shins. Also the side decks are max high so we don’t drag in the water and more crown in the foredeck to add stiffness and shed water.

Thanks

Andrew Pimental

Jibe Tech

Related Posts

Tags

Share This

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>